Scope of supply
Volta Energy Solutions built a copper foil factory at the Tatabánya-Környe Industrial Park in two phases, and UTB delivered the wastewater plant for both. Separate copper and chrome lines run the same core process: collection, pH adjustment, chemical treatment, precipitation, phase separation, sand filtration and sludge dewatering. The higher-flow copper line adds ultrafiltration and two-stage reverse osmosis, and the RO concentrate is split into clean water and salt by a multistage LTDis® vacuum evaporation (vacuum distillation) system, with the salt crystallised, so the plant runs as zero liquid discharge. Phase 3 of the factory has been designed by UTB, with installation expected.
- Phase 1: 501 m³/day, commissioned September 2020
- Phase 2: 1,024 m³/day, commissioned April 2023
- Cu and Cr lines · UF + 2-stage RO · LTDis evaporation and crystallisation
- Effluent to the public sewer network.
- Phase 3 designed; installation expected
| Client | Volta Energy Solutions |
| Location | Tatabánya, Hungary |
| Segment | Industrial |
| Capacity | 1,024 m³/day |
| Technologies | LTDis, Vacuum distillation, ZLD |