High-strength, seasonal effluent turned into biogas, reusable water and lower surcharges, for food processors, breweries and beverage producers, dairies, meat and rendering plants, and agri-industry.

What we're treating

Food and beverage effluent is strong, warm and seasonal. A vegetable campaign or a sugar season can run a plant hard for six weeks and leave it near-idle for the rest of the year, and the organic load arriving in that window is often ten to fifty times domestic strength.

Treating that load aerobically means paying for it in air. Treating it anaerobically turns it into biogas. Our process line starts with physico-chemical treatment and dissolved air flotation (DAF) to remove fats, oils and grease (FOG) and suspended solids, then sends the bulk COD through a high-rate anaerobic stage before an aerobic polish brings the effluent within discharge limits. Flotation and physico-chemical pre-treatment appear in 14 plants each across this sector, high-rate anaerobic in seven.

Load pattern
Campaign and shift-driven; long idle periods between production seasons
Binding limits
COD and suspended solids, with nitrogen where protein streams are involved
Hard case
Fats, oils and grease, and restarting biology after a seasonal shutdown
Opportunity
COD recovered as biogas instead of paid for as trade-effluent surcharge

88 plants delivered in this sector across 13 countries, 37,732 m³/day of combined capacity. These are written up with their commissioning data.

Stainless-steel reactor tower lit at night at the Kall Ingredients wastewater treatment plant, Tiszapüspöki, Hungary
Kall Ingredients logo
Flagship projectKall Ingredients (Tisza-TK)Tiszapüspöki, Hungary5,500 m³/dayBIODEC S 200 · CYCLATOR · METHANATORTurnkey anaerobic + CYCLATOR plant treating a 25 t/day COD load: the client named UTB Best EPC Contractor.
Walkway over the treatment basins at the Bonduelle vegetable-processing wastewater treatment plant, Nagykőrös, Hungary
Bonduelle logo
Flagship projectBonduelle Central Europe, NagykőrösNagykőrös, Hungary2,300 m³/dayUASB · ACTIVATORUASB and aerobic treatment at a cannery, 293,854 PE, effluent inside surface-water limits.
Covered anaerobic reactor and biogas pipework at the Dreher brewery wastewater treatment plant, Budapest, Hungary
Dreher Breweries logo
Flagship projectDREHER BreweriesBudapest, Hungary2,800 m³/dayUASBTurnkey UASB at a brewery: 107,333 PE, closed reactors and a biofilter for noise and odour.
METHANATOR anaerobic reactor at the Bonduelle vegetable-processing wastewater treatment plant, Békéscsaba, Hungary
Bonduelle logo
Flagship projectBonduelle Central Europe, BékéscsabaBékéscsaba, Hungary1,750 m³/dayUASB · ACTIVATORCannery plant built out in two phases to 1,750 m³/day and 226,041 PE.
Concrete HYBRATOR reactor and DAF unit at the Glencore oilseed-crushing wastewater treatment plant, Foktő, Hungary
Glencore logo
Flagship projectGlencore, FoktőFoktő, Hungary556 m³/dayHYBRATORDAF pre-treatment and MBBR at a multi-seed crush plant, later extended for the new refinery.
Activated sludge basin at the PepsiCo potato-snack plant wastewater treatment plant, Laktaši, Bosnia and Herzegovina
PepsiCo logo
Flagship projectPepsiCo, LaktašiLaktaši, Bosnia and Herzegovina300 m³/dayHYBRATORDAF and IFAS at a potato snack plant, discharging to a river within its limits.

Technologies applied in this sector

Counted from UTB's own delivered reference list: how often each process appears across the 88 plants in this sector.

HYBRATOR™5 plants

Moving-bed carrier media added to the Cyclator basin for extra load in the same footprint.

More on HYBRATOR →
CYCLATOR™8 plants

Continuously fed SBR carrying nitrification, denitrification and bio-P in one basin.

More on CYCLATOR →
Dissolved air flotation (DAF)14 plants

Flotation of fats, oils and suspended solids.

Physico-chemical line14 plants

Coagulation, flocculation and settling ahead of biology.

UASB7 plants

High-rate anaerobic reactor converting bulk COD to biogas.

ACTIVATOR4 plants

Conventional activated sludge with nutrient removal.

Reference plants

The largest 8 of 88 plants delivered in this sector.

PlantLocationCapacityYearProcess
Kall Ingredients (Tisza-TK)Tiszapüspöki, Hungary5,500 m³/day2018METHANATOR · CYCLATOR
DEKO-FOOD Zrt.Debrecen, Hungary3,000 m³/day2008UASB
Hungerit Zrt.Szentes, Hungary3,000 m³/day2005Physico-chemical · DAF
DREHERBudapest, Hungary2,800 m³/day2008UASB
Agrosprint Zrt.Karcag, Hungary2,300 m³/day2022CYCLATOR · UASB
Bonduelle Central Europe Kft.Nagykőrös, Hungary2,300 m³/day2012UASB · ACTIVATOR
Bonduelle Central Europe Kft.Békéscsaba, Hungary1,750 m³/day2012UASB · ACTIVATOR
Arany Kapu ZrtKunfehértó, Hungary750 m³/day2001ACTIVATOR