Scope of supply
UTB designed, implemented and commissioned the industrial wastewater treatment plant at Bonduelle’s cannery in Békéscsaba, including the civil works and electro-mechanical installation, with a UASB anaerobic stage followed by aerobic treatment. It was built out in two phases to a final capacity of 1,750 m³/day and 226,041 PE, and the treated effluent meets the strict requirements for discharge to surface water.
- 1,750 m³/day
- 226,041 PE
- 10,000 Nm³/day biogas
- UASB anaerobic + ACTIVATOR aerobic treatment
- Drum filter · primary sedimentation · methane reactor · Cyclox · DAF
- COD reduced from 13,705 to 75 mg/l
- Built out in two phases
- Completed 2012.
| Client | Bonduelle |
| Location | Békéscsaba, Hungary |
| Segment | Industrial |
| Capacity | 1,750 m³/day |
| Technologies | UASB, ACTIVATOR |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent (mg/l) |
|---|---|---|
| COD | 13,705 | 75 |
| Total P | 34 | 2 |
| Total N | 234 | 50 |
| TSS | 4,119 | 50 |