UTB Envirotec 30-year anniversary logo

Contact

Service

EPC / Turnkey

One contract and one point of responsibility, from feasibility study and design through construction, commissioning and operator training.

We work as an EPC contractor: a single point of responsibility from the process concept through detailed design, procurement, construction and commissioning, to the handover of a plant that meets its discharge limits. We also deliver under Design-Build and Build-Own-Operate (BOO) models, where a client prefers to buy an outcome rather than an asset.

UTB's first turnkey plant dates to 1996. We are certified to ISO 9001 (quality management) and ISO 14001 (environmental management).

Walkway over the covered treatment tanks at the Eger municipal wastewater treatment plant, Hungary

Eger: delivered in two phases, plant then biogas line

What it covers

Design
  • Consultancy
  • Concept design
  • Studies, including feasibility studies
  • Process design
  • Basic engineering
  • Permission design and the permitting procedure
  • Tender design
  • Detailed design
  • Control philosophy
  • PLC and SCADA programming
  • As-built drawings
  • Value engineering
Execution
  • Equipment supply
  • Electrical and mechanical installation works
  • Complete turnkey delivery including civil works
  • Start-up
  • Commissioning
  • Commissioning documents: preliminary manual, final manual and closing report
  • Training of the operator staff

How it runs

  1. 01
    Process concept and sizing

    The design basis is fixed from measured influent data, and the process selected and sized against the discharge limits.

  2. 02
    Permits

    Permitting taken through the authority, with the environmental assessment where one is required.

  3. 03
    Detailed design

    Process, civil, structural, mechanical, electrical, instrumentation and automation, all in-house.

  4. 04
    Procurement and subcontracting

    Equipment procured and subcontractors selected and managed by UTB.

  5. 05
    Construction and installation

    Site management, construction and installation management, HSE co-ordination.

  6. 06
    Commissioning and handover

    Trial operation, process verification, operator training, then completion certificates signed off.

342
Projects delivered
28
Countries
1,418,108
m³/day capacity
1964
First project

Counted from UTB's reference base by the activity recorded against each project.