Scope of supply
UTB designed, implemented and commissioned the industrial wastewater treatment plant at Bonduelle’s cannery in Nagykőrös, including the civil works and electro-mechanical installation, with a UASB anaerobic stage followed by aerobic treatment. It treats a hydraulic load of 2,300 m³/day and a biological load of 293,854 PE, and the treated effluent meets the strict requirements for discharge to surface water.
- 2,300 m³/day
- 293,854 PE
- UASB anaerobic + ACTIVATOR aerobic treatment
- Completed 2012.
| Client | Bonduelle |
| Location | Nagykőrös, Hungary |
| Segment | Industrial |
| Capacity | 2,300 m³/day |
| Technologies | UASB, ACTIVATOR |