UTB Envirotec 30-year anniversary logo

Contact

← All case studies

Bonduelle Central Europe, Nagykőrös

Nagykőrös, Hungary

UASBACTIVATORIndustrial
Walkway over the treatment basins at the Bonduelle vegetable-processing wastewater treatment plant, Nagykőrös, Hungary

Scope of supply

UTB designed, implemented and commissioned the industrial wastewater treatment plant at Bonduelle’s cannery in Nagykőrös, including the civil works and electro-mechanical installation, with a UASB anaerobic stage followed by aerobic treatment. It treats a hydraulic load of 2,300 m³/day and a biological load of 293,854 PE, and the treated effluent meets the strict requirements for discharge to surface water.

  • 2,300 m³/day
  • 293,854 PE
  • UASB anaerobic + ACTIVATOR aerobic treatment
  • Completed 2012.
ClientBonduelle
LocationNagykőrös, Hungary
SegmentIndustrial
Capacity2,300 m³/day
TechnologiesUASB, ACTIVATOR

On site

Walkway over the treatment basins at the Bonduelle vegetable-processing wastewater treatment plant, Nagykőrös, HungaryAccess walkway and basins at the Bonduelle wastewater treatment plant, Nagykőrös, HungaryConcrete treatment basins and pipework at the Bonduelle Nagykőrös industrial wastewater plant, Hungary