Glencore, Foktő

Foktő, Hungary

HYBRATORIndustrial
Concrete HYBRATOR reactor and DAF unit at the Glencore oilseed-crushing wastewater treatment plant, Foktő, Hungary

Scope of supply

UTB designed, built and commissioned the industrial wastewater treatment plant at the Glencore Group's multi-seed crush plant in Foktő (Pannon Növényolajgyártó, now Viterra), across both phases. The effluent is high in fats and organic matter. Physico-chemical pre-treatment with dissolved air flotation feeds HYBRATOR™ (MBBR) biological basins, with a buffer tank ahead of them and sludge storage, a dewatering centrifuge and a disinfection basin behind. Phase 1 (2013) treated 460 m³/day and 16,967 PE; the plant was later extended to take the effluent from the newly built refinery.

  • 556 m³/day
  • 29,893 PE
  • HYBRATOR biological basins behind DAF and buffering
  • Delivered across Phase I and Phase II
  • Completed 2023.
  • Phase 1: 460 m³/day, 16,967 PE, completed 2013
  • Later extended for the new refinery effluent
ClientGlencore
LocationFoktő, Hungary
SegmentIndustrial
Capacity556 m³/day
TechnologiesHYBRATOR

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

 
Parameter Influent (mg/l) Effluent limit (mg/l)
CODKr 4,000 108
BOD5 2,200 27
NH4-N 1 1
TP 5 2
TSS 200 100
 

On site

Concrete HYBRATOR reactor and DAF unit at the Glencore oilseed-crushing wastewater treatment plant, Foktő, HungaryBlowers and control equipment in the treatment building at the Glencore wastewater plant, Foktő, HungaryTreatment basin with the Glencore oilseed plant behind, Foktő, HungaryWalkway between the dissolved air flotation tanks at Glencore, Foktő, HungaryStainless pipework at the DAF pre-treatment stage of the Glencore wastewater plant, Foktő, HungaryHYBRATOR MBBR biological stage and outlet weir at the Glencore wastewater treatment plant, Foktő, Hungary