Scope of supply
UTB designed, built and commissioned the industrial wastewater treatment plant at the Glencore Group's multi-seed crush plant in Foktő (Pannon Növényolajgyártó, now Viterra), across both phases. The effluent is high in fats and organic matter. Physico-chemical pre-treatment with dissolved air flotation feeds HYBRATOR™ (MBBR) biological basins, with a buffer tank ahead of them and sludge storage, a dewatering centrifuge and a disinfection basin behind. Phase 1 (2013) treated 460 m³/day and 16,967 PE; the plant was later extended to take the effluent from the newly built refinery.
- 556 m³/day
- 29,893 PE
- HYBRATOR biological basins behind DAF and buffering
- Delivered across Phase I and Phase II
- Completed 2023.
- Phase 1: 460 m³/day, 16,967 PE, completed 2013
- Later extended for the new refinery effluent
| Client | Glencore |
| Location | Foktő, Hungary |
| Segment | Industrial |
| Capacity | 556 m³/day |
| Technologies | HYBRATOR |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent limit (mg/l) |
|---|---|---|
| CODKr | 4,000 | 108 |
| BOD5 | 2,200 | 27 |
| NH4-N | 1 | 1 |
| TP | 5 | 2 |
| TSS | 200 | 100 |