Scope of supply
UTB prepared the permit and construction design for the Adony municipal wastewater treatment plant under the KEHOP programme, supplied the two BIODEC™ S 150 decanters for its CYCLATOR™ basins and directed the commissioning.
- 397 m³/day
- 3,960 PE
- CYCLATOR · BIODEC S 150 ×2
- Permit and construction design, decanter supply, commissioning management
- Communal STP
- Completed 2019.
| Location | Adony, Hungary |
| Segment | Municipal |
| Capacity | 397 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,250 | 125 | 60 |
| BOD5 | 560 | 25 | 7 |
| TN | 120 | 55 | 10 |
| NH4-N | 90 | 20 | 5 |
| TSS | 800 | 35 | 16 |
| TP | 17 | 10 | 4 |