Agrosprint Zrt.

Karcag, Hungary

UASBCYCLATORBIODECIndustrial
Treatment basins and site buildings at the Agrosprint fruit and vegetable processing wastewater plant, Karcag, Hungary

Scope of supply

Agrosprint freezes and processes fruit and vegetables at Karcag. UTB built the plant for the factory's technological effluent as a greenfield investment discharging to surface water. It runs a mechanical stage, equalisation, a UASB anaerobic stage and two parallel CYCLATOR™ aerobic stages, with a full biogas system, flare, desulphurisation, drying, blower and gas boilers, plus sludge thickening and mechanical dewatering. A calamity and effluent storage pool and a utility building were built alongside.

  • 2,300 m³/day
  • 197,915 PE
  • 5,729 Nm³/day biogas
  • UASB + two parallel CYCLATOR lines · BIODEC-C ×2
  • Biogas system with desulphurisation and gas boilers
  • Commissioned November 2022.
ClientAgrosprint Zrt.
LocationKarcag, Hungary
SegmentIndustrial
Capacity2,300 m³/day
TechnologiesUASB, CYCLATOR, BIODEC

On site

Treatment basins and site buildings at the Agrosprint fruit and vegetable processing wastewater plant, Karcag, HungaryCovered METHANATOR reactor and biogas flare at the Agrosprint wastewater treatment plant, Karcag, HungaryAerated CYCLATOR basin with biogas equipment behind at the Agrosprint plant, Karcag, Hungary