Scope of supply

UTB prepared the permit and construction design for the Biharnagybajom municipal wastewater treatment plant under the KEOP programme, supplied the two BIODEC™ S 150 decanters for its CYCLATOR™ basins and directed the commissioning.

  • 510 m³/day
  • 5,100 PE
  • CYCLATOR · BIODEC S 150 ×2
  • Permit and construction design, decanter supply, commissioning management
  • Communal STP
  • Completed 2016.
ClientKEVIÉP Építőipari és Kereskedelmi Kft.
LocationBiharnagybajom, Hungary
SegmentMunicipal
Capacity510 m³/day
TechnologiesCYCLATOR, BIODEC

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

 
Parameter Influent (mg/l) Effluent Limit (mg/l) Effluent Quality (mg/l)
CODKr 1,200 125 35
BOD5 600 25 5
TN 105 55 3
NH4-N 100 20 1.6
TSS 600 35 10
TP 15 10 2.9
 

On site

Walkway between the CYCLATOR basins at the Biharnagybajom municipal wastewater treatment plant, HungaryOperations building of the Biharnagybajom wastewater treatment plant, HungaryCircular CYCLATOR tank and plant building at Biharnagybajom, Hungary