
Scope of supply
UTB prepared the permit and construction design for the extension of the Fegyvernek-Örményes municipal wastewater treatment plant under the KEOP programme, supplied the BIODEC™ S 200 decanter for its CYCLATOR™ basins and directed the commissioning.
- 630 m³/day
- 7,627 PE
- CYCLATOR · BIODEC S 200 ×1
- Permit and construction design, decanter supply, commissioning management
- Communal STP
- Completed 2016.
| Client | Veolia Water Technologies |
| Location | Fegyvernek-Örményes, Hungary |
| Segment | Municipal |
| Capacity | 630 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,476 | 75 | 51 |
| BOD5 | 738 | 25 | 14 |
| TN | 136 | 50 | 2.5 |
| NH4-N | 82 | 10 | 0.9 |
| TSS | 828 | 50 | 10 |
| TP | 30 | 5 | 0.8 |
On site



Have a project?
Request a technical assessment






