Scope of supply
UTB prepared the permit and construction design for the Gyulaháza municipal wastewater treatment plant under the KEOP programme, supplied the two BIODEC™ S 150 decanters for its CYCLATOR™ basins and directed the commissioning.
- 600 m³/day
- 6,250 PE
- CYCLATOR · BIODEC S 150 ×2
- Permit and construction design, decanter supply, commissioning management
- Communal STP
- Completed 2015.
| Client | STRABAG-MML Kft. |
| Location | Gyulaháza, Hungary |
| Segment | Municipal |
| Capacity | 600 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,250 | 75 | 29 |
| BOD5 | 625 | 25 | 10.6 |
| TN | 106 | 50 | 4.3 |
| NH4-N | 96 | 10 | 1.4 |
| TSS | 407 | 50 | 21.6 |
| TP | 16 | 5 | 1.2* |