Scope of supply
The plant treats wastewater from Kartal and Verseg and was subsidised by the European Union. Built turnkey by UTB, it runs a mechanical stage, two parallel CYCLATOR™ biological stages with nutrient removal, disinfection, and gravity thickening and mechanical dewatering of the excess sludge.
- 752 m³/day
- 7,493 PE
- Two parallel CYCLATOR lines with nutrient removal
- Effluent to the Nógrádi-Vanyarc stream
- Commissioned 1 April 2021.
| Client | Mészáros és Mészáros Kft. |
| Location | Kartal, Hungary |
| Segment | Municipal |
| Capacity | 752 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,181 | 100 | 55 |
| BOD5 | 598 | 25 | 12 |
| TN | 120 | 35 | 22 |
| NH4-N | 80 | 10 | 15 |
| TSS | 581 | 35 | 7 |
| TP | 18 | 5 | 0.8 |