UTB Envirotec 30-year anniversary logo

Contact

← All case studies

Lenti

Lenti, Hungary

CYCLATORBIODECMunicipal
Still CYCLATOR basin reflecting the walkway and trees at the Lenti municipal wastewater treatment plant, Hungary

Scope of supply

The plant treats wastewater from Lenti and seven surrounding municipalities, Csesztreg, Iklódbördőce, Kerkabarabás, Zalabaksa, Rédics, Pórszombat and Szilvágy, and was subsidised by the European Union. Delivered turnkey: mechanical stage, two parallel CYCLATOR™ biological stages with nutrient removal, disinfection, gravity thickening and mechanical dewatering of the excess sludge. The investment also included a technology building, a utility building and a garage.

  • 2,040 m³/day
  • 15,237 PE
  • Two parallel CYCLATOR lines with nutrient removal
  • Up to 50 m³/day septic waste; effluent to the Kerka river
  • Commissioned 17 June 2020.
ClientSzabadics Zrt.
LocationLenti, Hungary
SegmentMunicipal
Capacity2,040 m³/day
TechnologiesCYCLATOR, BIODEC

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

Parameter Influent (mg/l) Effluent Limit (mg/l) Effluent Quality (mg/l)
CODKr 898 125 43
BOD5 448 25 <10
TN 91 15/25 2.8
NH4-N 60 10 0.4
TSS 519 35 4
TP 14 2 2.7

On site

Still CYCLATOR basin reflecting the walkway and trees at the Lenti municipal wastewater treatment plant, HungaryRound sludge tanks and CYCLATOR basin at the Lenti wastewater treatment plant, Hungary