Scope of supply
UTB prepared the permit and construction design for the Mélykút municipal wastewater treatment plant under the KEOP programme, supplied the two BIODEC™ S 200 decanters for its CYCLATOR™ basins and directed the commissioning.
- 650 m³/day
- 5,610 PE
- CYCLATOR · BIODEC S 200 ×2
- Permit and construction design, decanter supply, commissioning management
- Communal STP
- Completed 2015.
| Client | STRABAG-MML Kft. |
| Location | Mélykút, Hungary |
| Segment | Municipal |
| Capacity | 650 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,036 | 50 | 46.6 |
| BOD5 | 518 | 15 | 13.9 |
| TN | 95 | 15 | 5 |
| NH4-N | 67 | 2 | 0.2 |
| TSS | 475 | 30 | 20 |
| TP | 16 | 0.7 | 0.62 |
On site