Mélykút

Mélykút, Hungary

CYCLATORBIODECMunicipal
Concrete CYCLATOR basins at the Mélykút municipal wastewater treatment plant, Hungary

Scope of supply

UTB prepared the permit and construction design for the Mélykút municipal wastewater treatment plant under the KEOP programme, supplied the two BIODEC™ S 200 decanters for its CYCLATOR™ basins and directed the commissioning.

  • 650 m³/day
  • 5,610 PE
  • CYCLATOR · BIODEC S 200 ×2
  • Permit and construction design, decanter supply, commissioning management
  • Communal STP
  • Completed 2015.
ClientSTRABAG-MML Kft.
LocationMélykút, Hungary
SegmentMunicipal
Capacity650 m³/day
TechnologiesCYCLATOR, BIODEC

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

Parameter Influent (mg/l) Effluent Limit (mg/l) Effluent Quality (mg/l)
CODKr 1,036 50 46.6
BOD5 518 15 13.9
TN 95 15 5
NH4-N 67 2 0.2
TSS 475 30 20
TP 16 0.7 0.62

On site

Concrete CYCLATOR basins at the Mélykút municipal wastewater treatment plant, HungaryBlower building beside the CYCLATOR basin at the Mélykút wastewater treatment plant, HungaryTwin CYCLATOR basins with BIODEC decanters at Mélykút, Hungary