CYCLATORBIODECMunicipal
Twin SBR basins with BIODEC decanters at the Nagyszénás municipal wastewater treatment plant, Hungary

Scope of supply

UTB prepared the permit and construction design for the Nagyszénás municipal wastewater treatment plant under the KEOP programme, supplied the two BIODEC™ S 150 decanters for its CYCLATOR™ basins and directed the commissioning.

  • 530 m³/day
  • 4,858 PE
  • CYCLATOR · BIODEC S 150 ×2
  • Permit and construction design, decanter supply, commissioning management
  • Communal STP
  • Completed 2014.
ClientSTRABAG-MML Kft.
LocationNagyszénás, Hungary
SegmentMunicipal
Capacity530 m³/day
TechnologiesCYCLATOR, BIODEC

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

Parameter Influent (mg/l) Effluent Limit (mg/l) Effluent Quality (mg/l)
CODKr 1,100 75 51
BOD5 550 25 10
TN 123 50 9
NH4-N 80 10 4.9
TSS 600 35 10
TP 20 5 4