Scope of supply
UTB delivered the municipal wastewater treatment plant at Ópusztaszer built on CYCLATOR™, with BIODEC™ S 100 ×2 decanters, completed 2014.
- 310 m³/day
- 3,116 PE
- CYCLATOR · BIODEC S 100 ×2
- Communal STP
- Completed 2014.
| Client | Probart Kft. |
| Location | Ópusztaszer, Hungary |
| Segment | Municipal |
| Capacity | 310 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,206 | 75 | 39 |
| BOD5 | 603 | 25 | 5.4 |
| TN | 111 | 50 | 17 |
| NH4-N | 72 | 10 | 2.6 |
| TSS | 681 | 35 | 31 |
| TP | 18 | 5 | 2.3 |