Scope of supply
UTB prepared the permit and construction design for the Tolna municipal wastewater treatment plant under the KEOP programme, supplied the four BIODEC™ S 200 decanters for its CYCLATOR™ basins and directed the commissioning.
- 2,500 m³/day
- 27,292 PE
- CYCLATOR · BIODEC S 200 ×4
- Permit and construction design, decanter supply, commissioning management
- Communal STP
- Completed 2014.
| Client | ALISCA BAU Zrt. |
| Location | Tolna, Hungary |
| Segment | Municipal |
| Capacity | 2,500 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,277 | 125 | 51 |
| BOD5 | 639 | 25 | 5 |
| TN | 117 | 55 | 5 |
| NH4-N | 94 | 20 | 1.6 |
| TSS | 745 | 35 | 12 |
| TP | 17 | 10 | 3 |