Scope of supply
UTB delivered the municipal wastewater treatment plant at Vácszentlászló built on CYCLATOR™, with BIODEC™ S 150 ×2 decanters, completed 2013.
- 750 m³/day
- 7,020 PE
- CYCLATOR · BIODEC S 150 ×2
- Communal STP
- Completed 2013.
| Client | Vácszentlászló Agglomeráció Önkormányzati Társulás |
| Location | Vácszentlászló, Hungary |
| Segment | Municipal |
| Capacity | 750 m³/day |
| Technologies | CYCLATOR, BIODEC |
Parameters as commissioned
Influent, the consent limit, and the effluent quality actually measured.
| Parameter | Influent (mg/l) | Effluent Limit (mg/l) | Effluent Quality (mg/l) |
|---|---|---|---|
| CODKr | 1,123 | 125 | 30 |
| BOD5 | 562 | 25 | 4.9 |
| TN | 103 | 25 | 7.2 |
| NH4-N | 67 | 5 | 0.2 |
| TSS | 655 | 35 | 5.5 |
| TP | 17 | 2 | 0.3 |
On site



Have a project?
Request a technical assessment