Vácszentlászló

Vácszentlászló, Hungary

CYCLATORBIODECMunicipal
Aeration pipework running into the CYCLATOR basins at the Vácszentlászló wastewater treatment plant, Hungary

Scope of supply

UTB delivered the municipal wastewater treatment plant at Vácszentlászló built on CYCLATOR™, with BIODEC™ S 150 ×2 decanters, completed 2013.

  • 750 m³/day
  • 7,020 PE
  • CYCLATOR · BIODEC S 150 ×2
  • Communal STP
  • Completed 2013.
ClientVácszentlászló Agglomeráció Önkormányzati Társulás
LocationVácszentlászló, Hungary
SegmentMunicipal
Capacity750 m³/day
TechnologiesCYCLATOR, BIODEC

Parameters as commissioned

Influent, the consent limit, and the effluent quality actually measured.

Parameter Influent (mg/l) Effluent Limit (mg/l) Effluent Quality (mg/l)
CODKr 1,123 125 30
BOD5 562 25 4.9
TN 103 25 7.2
NH4-N 67 5 0.2
TSS 655 35 5.5
TP 17 2 0.3

On site

Aeration pipework running into the CYCLATOR basins at the Vácszentlászló wastewater treatment plant, HungaryCircular CYCLATOR tank and control building at the Vácszentlászló municipal wastewater treatment plant, HungaryThe Vácszentlászló wastewater treatment plant in its rural setting, Hungary